CASE_01 // AMAZON EMA5
KETTERING, UK
Amazon EMA5 Greenfield (IDX Series)
At EMA5 I cover my section as Section Team Lead within TGW's larger greenfield rollout of
Amazon's next-generation IDX series in the UK. My scope is the twin crossbelt sorter — I
coordinate the installation of that section, align the mechanical and operational layers with
Amazon's playbook, and own the handover for what's mine. Other sections, other leads —
this one's mine.
#Site-Management
#Section-Team-Lead
#Greenfield-IDX
CASE_02 // SYSTEM INTEGRATION
EMA5 SITE, UK
Twin Crossbelt Integration & Compliance Audit
The twin crossbelt sorter is the heart of EMA5's primary flows — a massive, high-capacity system
that had to be integrated by a third party without a hitch. I owned that coordination, and at the same
time I built an automated handover audit pipeline that dynamically checks every step and logs
technical compliance evidence in real time.
#MHE-Integration
#Twin-Crossbelt-Sorter
#Handover-Compliance-Audit
CASE_03 // AMAZON DSA2
HULL, UK
Amazon DSA2 — Crossbelt Sorter Section
I covered my section as Section Team Lead on the DSA2 fulfilment centre, from pre-installation
through to final handover of the crossbelt sorter. My scope was the sorter section — I coordinated
installation, commissioning, and the final clean close-out with the wider TGW and Leonardo team.
#DSA2-Hull
#Section-Team-Lead
#Crossbelt-Sorter
CASE_04 // EPGC (TGW ITALIA)
NEUVILLE-EN-FERRAIN, FR
EPGC — Brownfield Expansion, Spare-Parts Warehouse
Brownfield expansion of the EPGC spare-parts warehouse for industrial kitchen equipment
(REPA Group), with the original facility live and operators on-site throughout the works.
Six-month project under French labour regulation — durée du travail, document unique,
médecine du travail — including a Labour Inspectorate visit on-site, passed clean.
#EPGC-REPA
#Brownfield-Expansion
#French-HSE
CASE_05 // FORMASAL (TGW ITALIA)
VITERBO, IT
Formasal — HoReCa Cash & Carry Automation
Greenfield HoReCa cash-and-carry distribution centre at Poggino (Viterbo), one of the world's
first mini-shuttle installations at dual temperature (chilled + frozen) — 24,000 bin locations —
paired with a 2,800-pallet compactable warehouse under a central WMS. First major site as
employed Site Manager for TGW Italia.
#Formasal-HoReCa
#Mini-Shuttle-DualTemp
#TGW-Italia
CASE_06 // AMAZON ROBOTICS
EUROPEAN SITES
Standardizing Fulfillment & Sorter Rollouts
Robotic sortation only works if every site rolls out the same way. I led that standardization across
some of Amazon's biggest European hubs — FCO2 in Italy, SCN2, MUC3 and PAD2 in Germany, BRQ2 in
the Czech Republic, LYS2 in France — coordinating installation, testing, and mechanical integration
without losing the thread across borders.
#Robotics
#System-Rollout
#Cross-Border-Coord
CASE_07 // CERAMICS AUTOMATION
GLOBAL SITES
System Ceramics (Coesia Group) Automation
As a freelance Site Manager for System Ceramics (now part of Coesia Group), I was trusted with the full-line
integration of ceramic plants across four continents — from the heavy GEA Lamina presses at the head
of the line, all the way down to the end-of-line packaging of finished slabs. I supervised the civil works,
kept commissioning on time and on budget, and brought each site to a clean final acceptance test.
India, Spain, China, Italy (Laminam) — different cultures, same standard.
#System-Ceramics
#Coesia-Group
#Heavy-Duty-Lines
CASE_08 // ENTREPRENEURSHIP & R&D
MARANELLO, ITALY
Arcadia s.r.l. Ceramic Product R&D
Thirteen years. That's how long I ran Arcadia s.r.l. as founder and operating partner in Maranello,
with full P&L accountability. I directed the R&D of new large-format slab collections, built the
digital backbone (CAD pipelines, ERP for orders and warehouse), and kept us compliant on HSE and
environmental standards. It taught me that in ceramics, design and engineering have to speak the same
language — or the line stops.
#Product-R&D
#Process-Digitalization
#Safety-Compliance
CASE_09 // DIGITAL DESIGN ORIGINS
SASSUOLO, ITALY
Industrial Web Portals & Print Graphics
Before I ever set foot on a construction site, I was coordinating design teams in Sassuolo — at
Media Logic and Stylgraph — building some of the first B2B web portals for the ceramic industry.
We worked on professional Macintosh stations, ran LaserLab for print pre-press, and pushed the limits
of early 3D product rendering (Realsoft). That's where I learned that a pixel on a screen and a
millimeter on a slab aren't that different — both have to land exactly where you said they would.
#Digital-Design
#Web-Portals
#Industrial-Origins