< BACK TO SASSI.ENG
SASSI.ENG // CV // ZERO_FABRICATION PROTOCOL — data mirrored from the live site, v6

ANDREA SASSI

Site Manager & Industrial Automation Consultant — high-volume logistics, sorter integration, robotic fulfillment. CITB SMSTS (UK) · Preposto di Cantiere (IT). Based Casalgrande (IT) / Kettering (UK), available EU-wide.

CONTACT: andrea@asassi.cloud · LANGUAGES: Italian (native), English (professional)

01 // SNAPSHOT

DELIVERED SITES21+ across UK, IT, FR, DE, CZ (+ India, Spain, China in ceramics years)
CURRENTSection Team Lead — Amazon EMA5 Kettering greenfield (IDX series), twin crossbelt sorter, TGW UK
HSEUK: CITB SMSTS · IT: Preposto di Cantiere (D.Lgs. 81/2008 Art.19) · FR: projet under droit du travail (inspection passed)
SYSTEMSTGW sortation/crossbelt, mini-shuttle dual-temp, WMS integrations, BIM 360/Navisworks, SAP/Navision/JIRA, SQL, PLC handover, Java (EQF 5 IoT)

02 // EXPERIENCE

Section Team Lead — TGW UK · Amazon EMA5 Kettering (IDX Series)

CURRENT · UK · GREENFIELD

Own the twin crossbelt sorter section: installation coordination, mechanical/operational alignment with Amazon playbook, section handover. Built an automated handover audit pipeline logging compliance evidence in real time.

Section Team Lead — TGW · Amazon DSA2 Hull

UK · GREENFIELD

Crossbelt sorter section from pre-installation to final handover: coordination, commissioning, clean close-out with TGW/Leonardo.

Site Manager — TGW Italia · EPGC Neuville-en-Ferrain (REPA Group)

FRANCE · BROWNFIELD, LIVE OPERATIONS

Six-month spare-parts warehouse expansion with the facility live throughout. Full French labour-law compliance; passed Labour Inspectorate visit on-site.

Site Manager — TGW Italia · Formasal Viterbo

ITALY · GREENFIELD

HoReCa cash-and-carry DC: world-first mini-shuttle installation at dual temperature (chilled+frozen), 24,000 bin locations, 2,800-pallet compactable warehouse under central WMS.

Site Manager (freelance) — System Ceramics, Coesia Group

GLOBAL · INDIA, SPAIN, CHINA, ITALY

Full-line ceramic plant integration: GEA Lamina heavy presses through end-of-line packaging. Civil works supervision, commissioning on time and budget, final acceptance tests.

Standardization Lead (robotic sortation) — Amazon European rollouts

FCO2 · SCN2 · MUC3 · PAD2 · BRQ2 · LYS2

Cross-border standardization of fulfillment and sorter rollouts: installation, testing, mechanical integration under one method across six hubs.

Founder & Operating Partner — Arcadia s.r.l., Maranello

13 YEARS · FULL P&L

Ceramic product R&D company: large-format slab collections, CAD pipelines, ERP backbone, HSE/environmental compliance.

Design Team Coordinator — Media Logic, Stylgraph (Sassuolo)

DIGITAL ORIGINS

First-generation B2B web portals for the ceramic industry; print pre-press (LaserLab), early 3D product rendering.

03 // CERTIFICATIONS

04 // ENGAGEMENT

Available for site/section leadership (3–12 months), handover & compliance audits (2–6 weeks), and rollout advisory retainers. andrea@asassi.cloud — full site.

© 2026 ANDREA SASSI · BUILT WITH ZERO_FABRICATION PROTOCOL